Encyclopedia of fire safety

Projects of wooden houses. Projects of two-storey log houses

A house with an area of ​​100 square meters is an excellent option for suburban housing, which can be easily located both on a large plot of land and on a small one. It can easily fit on 4 and 6 acres. At the same time, there will be room for a small gazebo, a bathhouse and a garden.

The company "MariSrub" offers projects of wooden houses 10x10 one-story, two-story and with an attic. A typical variant is a cottage with an attic, the layout of which includes a living room, a kitchen-dining room, two bathrooms, two or three bedrooms, and a hall. Popular projects with an office and dressing room. The architect of the company will develop an individual project or make changes to an already finished version.

The masters of the company will perform a full list of services for the construction of a country house:

  • Design;
  • Selection and production of lumber;
  • Foundation installation;
  • Construction of a log house on a land plot;
  • Roof installation;
  • Conducting electricity, water and gas supply;
  • Internal and external finishing.

When ordering construction, we perform design for free!

Advantages of 10x10 houses

A 10x10 house is not a simple country house, but a full-fledged seasonal or permanent housing. The layout of such a room has maximum comfort and convenience, even with a small area. For a comfortable stay in winter, choose logs with a diameter of more than 240 mm.

The light construction of a log does not require a deep expensive foundation, and the good thermal insulation qualities of wood will save on building materials. The logs have a beautiful smooth surface and an attractive rounded shape, so finishing is not required. As a result, you will spend 2-2.5 times less money on the construction of a wooden house than on a stone or block building.

MariSrub uses rounded and chopped pine logs as sawn timber. This is a durable and reliable raw material that, if properly processed, will last 70-80 years. Pine perfectly resists moisture, does not dry out and does not rot. And the pleasant aroma of needles and the healing properties of wood will create a unique atmosphere of warmth and comfort. Projects of 10x10 houses are more practical and more convenient than bulky cottages due to their compactness and versatility. The layout of the cottages of the MariSrub company does not provide for a large number of internal partitions. This will increase the space, add air and light. In addition, indoors you can easily rearrange the furniture and change the layout.

Designed for a large family, it is able to please its owners with convenience and comfort for decades. A rather unusual and original design solution for the roof gives this log building a particularly charming appearance. The presented project of a wooden house has many advantages, one of which is its internal lighting created by many large windows. This remarkable building perfectly combines refined style, majesty and practicality.

The porch of this house is nice and cozy. This porch leads to the hallway, which serves as a kind of heat protection in the house, since it does not allow cold air from the street into the interior. From the entrance hall you can go to the hall, and from it - to one of the four rooms that are on the ground floor: a spacious and bright living room, an equally large kitchen-dining room, a bathroom and a bathroom. A beautiful wooden staircase from the hall leads directly to the second floor.

The second floor begins again with a large hall, from which there are entrances to three cozy, wonderful bedrooms and a spacious sanitary unit, which is located at an equal distance from all the bedrooms. Surely, you have already understood that the layout of this house is very convenient, and given the fact that high-quality logs were used for construction, then it can rightly be called a dream home.

Equipment

Strapping and floor joists

Array. When building a house from an array, the lower trim of the house is made of a material corresponding to the wall.
Frame. With frame technology, the lower trim is carried out with a cut beam with a section of 100x150mm.

Walls and partitions

Array. When building a house from an array:

  • The outer walls of the first floor are made of the material selected by the customer for construction (solid timber, glued timber, logs).
  • The internal partitions of the first floor are framed, sheathed with class "B" clapboard on both sides.
  • Frame partitions are installed with a sedimentary gap for the possibility of shrinkage of the walls of the house.

Frame. With frame assembly technology at home:

  • The frame of the outer walls is made of edged boards 50x150 (thickness) mm.
  • The frame of the internal partitions is made of edged boards 50x100 (thickness) mm.
  • External walls and internal partitions are sheathed with clapboard class "B" on both sides.
  • The outer walls are insulated with glass-staple fiber 150 mm thick.
  • On the outside of the walls, the insulation is laid with a wind- and moisture-proof vapor-permeable membrane, on the inside - with a vapor barrier membrane.
  • Insulation of internal partitions is not carried out.
  • The internal height of the premises on the first floor is from 2.35 to 2.4 m.

Floors and joists

  • Regardless of the construction technology, the floors of the first floor are double.
  • The draft floor is assembled from edged boards with a thickness of 19-20 mm, based on the cranial bars of the floor beams.
  • The finished floor is assembled from a fine planed grooved board with a thickness of 30-40mm.
  • Floor logs are made with a section of 50x150 mm, floor beams are installed in increments of 0.5 m.
  • The floors of the first floor are insulated with glass-staple fiber 50 mm thick, the insulation is laid on both sides: from below - with a wind and moisture-proof vapor-permeable membrane, from above - with a vapor barrier membrane.

Interfloor ceilings

  • Interfloor floor beams are made of boards with a section of 50x150mm.
  • The beams are installed in increments of 0.5 m and rest on the outer walls of the house and the support beam.
  • The ceiling of the interior premises of the first floor is hemmed with a class "B" clapboard from the bottom of the interfloor floor beams.
  • Insulation is laid between the beams - glass-staple fiber 50 mm thick, insulation is laid on both sides with a vapor barrier membrane.

Stairs

  • A staircase is installed inside the house, the main elements of which (steps, stringers, bowstrings) are made of wooden furniture panels.
  • Useful width of steps of a ladder - 830 mm.
  • The stairs are assembled on self-tapping screws using metal corners for fastening winder steps and other structural elements.

Attic

  • The attic in the basic configuration is one common room without partitions.
  • Outside and inside, including the ceiling, sheathed with class "B" clapboard. Warming is not performed.
  • The floor of the attic is assembled from a floor planed grooved board 30-40 mm. Ceiling height 2.4 m.

Doors and windows

  • Entrance and interior panel doors are installed in the house.
  • Paneled doors are not equipped with handles for opening and locks.
  • Windows are installed wooden double glazing size 1.2x1.2.

Roof

  • Changing the shape of the roof from a gable to a broken one is free of charge.
  • Roofing - galvanized steel in the form of corrugated sheets.

Delivery

  • Delivery up to 100 km from our production base in Bear Lakes is free.

A 10x10 house project can be implemented in several ways:

  • Standard log house without additional outbuildings;
  • Log house with a veranda with log removal by 2-3 meters, or with a veranda with chopped gables;
  • Log house with an attic floor (in fact, a two-story log house).

Log cabin 10x10 two-story or one-story

A one-story log house of this size allows you to get quite a decent area, but why not build an attic floor, which, for a relatively small cost, will significantly expand the usable area?

The attic requires raising the height of the walls in order to organize comfortable rooms “on the roof”. In fact, this is a high attic.

If you insulate the roof, then the attic allows you to make a bedroom, a rest room or even a children's bedroom on the second floor.

The best coniferous forest for construction

We build houses from our own coniferous forest, which we harvest ourselves in the suburbs of the city of Velizh, Smolensk region. It is this territory that provides almost the entire central part of Russia with high-quality coniferous forest for the construction of houses and baths.

Next to the plot where we cut wood is our construction site. Here we assemble bathhouses and houses, including such spacious projects as a log house of 10 by 10 houses. After assembling the log house, we disassemble it, load it onto transport and send it to the client’s site.

Our main market is Moscow and the Moscow region. But we also ship our log cabins to St. Petersburg, the Leningrad region, Kaluga, Bryansk, Pskov, Oryol, Kursk, Vladimir, Ryazan and neighboring regions. At will, it is possible to send a felling of the house and to other regions.

They built a country house using frame technology plus a small veranda. The cost came out quite economically, and in terms of 3 and a half months. Finished even a couple of weeks earlier than promised. We go to the country house only in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you so much for building a house of aerated concrete. The quality of both material and work is excellent - FRIENDS ENVY. The terms of the work performed - in about 4.5 months a house was built from scratch. Good luck to you all, good clients and big houses!!


They built a house for us in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration in the fall), it turned out not cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse with them! Thank you for such professional guys that you provided us!


Thank you so much for your hard work and dedication! Everything is prompt, high-quality, fast! Thanks to the team led by Alexei!


The company built a great summer house for me! I have no complaints about the company, next summer I am going to build a bathhouse and a garage, I will definitely contact them. Thanks to everyone, especially Sergey's team, which built for me, a lot depends on them!


We built a house of aerated concrete in your company - very satisfied. A house was built on our pre-prepared foundation in 45 days. And as a gift received home insurance for a year. So I recommend.


In August 2017, I ordered a foundation (monolithic slab) for a house in the Leningrad region. In 2018, I already ordered the house itself. I can recommend, because were satisfied with the result. Everything was done quickly and professionally.


We ordered a house and a garage in this company in the summer of 2016. The builders worked for about 4 months without a break (they liked it very much). Everything was done according to the contract, no extra money was asked.


Frequently asked questions before construction

About company

How long has your company been operating?

Our company began work as a repair and finishing company in 2007. From that moment we have grown to the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

What confirms the competence of specialists?

All architects and engineers of the company have qualification certificates. Because the project is not accompanied by a company license, but by an architect's certificate. By law, the architect is responsible for the project.

Does your company do all the work? Or are you hiring contractors?

  • We ourselves carry out general construction, finishing works, site arrangement, wiring of engineering systems (electricity, heating in the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: the production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Search, attraction, compliance with agreements and control over the performance of work by contractors is our task.
  • We carry out 80% of all works on the construction of your house on our own and only 20% involve contractors.
  • We conclude an agreement with each contractor, in which he indicates a guarantee for the work performed by him, and in case of malfunctions, their elimination lies with the contractor.

Can I see the objects that are currently in operation?

Yes, there are objects that we can show at different stages of work and houses that have already been handed over by prior arrangement.

about the project

Buy a standard project or order an individual one?

Buy a finished project.

  • The plus is the price.
  • Minus - it will not provide for all your wishes regarding materials and layouts. Also, it will require refinement for the features of your site.

Buy a finished project and modify it.

It all depends on the changes you want to make. It is possible that it will be more profitable for you to develop an individual project than to modify a typical one.

The cost of such improvements should be discussed at the meeting.

Development of an individual house project.

  • Pros: all your wishes regarding all the characteristics of the house and the site are taken into account.
  • Minus - the cost of such a project is higher than a typical one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free of charge for you.

How is the development of an individual project?

  • The development of an individual project begins with the signing of the contract and the first meeting with the architects, at which the client voices his wishes. As a result of the meeting, a design task is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move on. During the entire design period, several meetings with the client take place, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a Working Draft is being developed. This is the calculation stage of each design solution, in which the client is not involved.
  • This whole process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when applying for a building permit.

About construction

Will you travel to the site where the construction is planned?

Yes. When inspecting the site, we take into account the dimensions, the entrance from the road and its width, the proximity of neighbors' buildings, the presence of a slope or difference, cardinal points and what kind of soil is on the site.

Do you help with the selection of a building site?

Yes. Our experts help with site selection. They will help you find it according to your requirements on the Internet with ads.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, conditions of entry, location
  • materials used in construction
  • house architecture features
  • conditions for the production of work (limitations on work time)

What guarantees do you give?

We give a guarantee of 3 years for our work. The warranty is given by the manufacturer and it is different in each case. There are materials for which the manufacturer gives a lifetime warranty.

How can I control construction?

  • We send each client a step-by-step photo report of the work.
  • We install online video surveillance of the object 24 hours a day, you and the company's specialists have access to it (paid service).
  • You can also use the services of companies that carry out technical control.
  • The construction is being delivered in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the development and approval of the estimate.

When do I have to pay for your work?

For design, an advance payment must be made within 5 days after signing the contract in the amount of 70% of the total amount. The balance is paid when the finished project is handed over to the client.

Payment for construction is broken down according to the stages that are specified in the estimate. Each stage of construction is also divided into payments, the amount of which may be different (usually this is due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders near the construction site, a garden house, a construction trailer, an old house or any other building with a roof will do.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will place our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a capacity of at least 5 kW and technical water.

If not, we will bring our generators for FREE. Water in most cases in wooden construction is used only for domestic needs, we will provide its delivery on our own.

What time of year do you build?

We build all year round, one of the important conditions in the spring-autumn period is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save money by correctly calculating the estimate and choosing high-quality materials.

Perform high-quality design documentation, thanks to which you can not worry about the design decisions made.

We work throughout the Moscow region

Volokolamsky district, Voskresensky district, Dmitrovsky district, Egorevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomensky district, Krasnogorsky district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Luberetsky district, Mozhaysky district, Mytishchi district, Naro-Fominsk district, Noginsky district, Odintsovo district, Ozersky district n, Orekhovo-Zuevsky district, Pavlovsky-Posadsky district, Podolsky district, Pushkinsky district, Ramensky district, Ruzsky district, Sergiev Posadsky district, Silver-Prudsky district, Serpukhov district, Solnechnogorsk district, Stupinsky district, Taldom district, Chekhov district, Shatursky district, Shakhovskoy district, Schelkovsky district.

A well-designed and built 10 by 10 house made of logs is an excellent option for suburban housing. It can have an original or classic design, one or more floors, a spacious attic or veranda. Such a large house will perfectly fit on a plot of 4-6 acres or more, leaving room for a bathhouse, a garden, a kitchen garden, a neat gazebo.

Features of the construction and planning of a log house

When planning to build a log house, future owners can look into professional projects. Independent plans and drawings often contain errors and are not considered in the city's architectural departments. The process of designing and building such a large house has certain nuances:

  1. With a large area, it is important to accurately select the cross section and type of material. For year-round use, logs for a log house 10x10 must be more than 280 mm in diameter. The choice of such material leads to an increase in the cost of construction, but large logs do not require additional insulation.
  2. Proper selection of the foundation. For the construction of such structures, a monolithic or tape version is suitable. If the site already has pile or column foundations, the premises of the house are planned so as not to burden the second floor.
  3. A turnkey log house 10x10 will be more attractive if you choose an interesting shape and the correct number of storeys. The ideal option is a two-story building with an attic.

Advantages of log houses over other types of housing

In our company, you can order the construction of a large house from rounded logs 10 by 10 on a turnkey basis or for shrinkage. Assembly of the house takes 2-3 months. The shrinkage period depends on the season. For "winter" houses, 9 months of exposure is enough. A log house built in the summer is important to leave to dry for at least 11-12 months.

A ready-to-occupy building of a large area has the following advantages:

  • reliable docking of logs;
  • environmental friendliness, strength and durability;
  • high thermal insulation properties;
  • maintaining optimal oxygen balance and humidity in the premises;
  • monumental appearance that blends in beautifully with the environment.

The price of a house 10 by 10 from rounded logs

You can find out the cost of houses 10 by 10 by viewing the projects of houses in our catalog. The price of the finished project includes the material, the work of specialists, and takes into account the complexity of the architectural project. For your money you will receive:

  • wood harvested in accordance with all the rules in Russian forests;
  • design and construction in compliance with GOSTs and SNIP;
  • competent expert advice;
  • high-quality log house at home 10 by 10, assembled in a short time;
  • coordination of each stage of design and assembly;
  • service and warranty.

Do you want to live in a beautiful, eco-friendly and comfortable home? Our company will help you with this! Masters will create for you a reliable cottage that will please you with excellent thermal insulation, everyday comfort and high aesthetics.

Similar posts