Working hours in 2015
Number of days for 2015
Calendar - 365
Working days - 247
Weekends / Holidays - 118
Working hours for 2015 (in hours)
at a 40-hour week - 1971
with a 36-hour week - 1773.4
with a 24-hour week - 1180.6
* Pre-holiday days, during which the working time is reduced by one hour.
Commentary on the production calendar for 2015
This production calendar shows the norm of working hours for months, quarters and 2015 as a whole for 40-, 36- and 24-hour work weeks, as well as the number of working days and days off for a five-day work week with two days off.
Non-working holidays
Article 112 of the Labor Code of the Russian Federation establishes the following non-working holidays in the Russian Federation:
Did you know that:
In terms of the amount of vacation pay, it is more profitable to take annual leave in months with the largest number of working days. According to the production calendar in 2015, these are July and December. However, this applies exclusively to those whose wages are fixed.
According to Article 6 of the Labor Code of the Russian Federation, laws and other regulatory legal acts of state authorities of the constituent entities of the Russian Federation may establish additional non-working holidays. The corresponding norm is also contained in the Resolution of the Presidium of the Supreme Court of the Russian Federation of December 21, 2011 N 20-PV11 and in paragraph 8 of the letter of the Ministry of Labor of the Russian Federation of July 10, 2003 N 1139-21.
Postponing the weekend
In accordance with part five of Article 112 of the Labor Code of the Russian Federation, for the purpose of rational use of weekends and non-working holidays by employees, days off can be postponed to other days by federal law or a regulatory legal act of the Government of the Russian Federation
By Decree of the Government of the Russian Federation of August 27, 2014 N 860 "On the transfer of days off in 2015", the following days off were postponed in 2015:
Therefore, taking into account the postponement of holidays in 2015, the "New Year's Holidays" for employees will last 11 days - from January 1 to January 11, 2015.
In May 2015, workers will rest from May 1 to May 4 in connection with the celebration of the Spring and Labor Day, as well as from May 9 to 11 in connection with the Victory Day celebrations. In June, the rest period in connection with the celebration of the Day of Russia will last 3 days (12-14 June).
Determination of the norm of working hours
Did you know that:
The Russian Federation from year to year takes the first positions in the ranking of countries in terms of the number of days off. In the production calendar for 2015, you can count 118 days off, which is a third of the total number of calendar days.
In accordance with the Procedure for calculating the norms of working hours, approved. By order of the Ministry of Health and Social Development of Russia of 13.08.2009 N 588n, the working time is calculated depending on the established working hours per week according to the estimated schedule of a five-day working week with two days off on Saturday and Sunday, based on the duration of daily work (shift). So, with a 40-hour working week, the norm of working time is 8 hours, with a working week of 36 hours, it will be 7.2 hours; with a 24-hour work week - 4.8 hours.
In accordance with part 1 of article 95 of the Labor Code of the Russian Federation, the duration of a working day or shift immediately preceding a non-working holiday is reduced by one hour. In 2015, employees will work one hour less on April 30, May 8, June 11, November 3, December 31.
The working time norm calculated in the indicated order applies to all modes of work and rest.
Examples of
In January 2015, with a five-day working week with two days off, there will be 15 working days and 16 days off.
Working hours in January 2015 will be:
with a 40-hour work week - 120 hours (8 hours x 15 days);
with a 36-hour work week - 108 hours (7.2 hours x 15 days);
with a 24-hour work week - 72 hours (4.8 hours x 15 days).
In 2015, in total, with a five-day working week with two days off, there will be 247 working days, including 5 working days shortened by one hour, indicated above, and 118 weekends and non-working holidays. Interestingly, the number of working days, as well as weekends and non-working holidays in 2015 did not change compared to 2014.
The working time in 2015 as a whole will be:
with a 40-hour work week - 1,971 hours (one hour more than in 2014)
(8 hours x 247 days - 5 hours);
with a 36-hour work week - 1,773.4 hours
(7.2 hours x 247 days - 5 hours);
with a 24-hour work week - 1,180.6 hours
(4.8 hours x 247 days - 5 hours).
A production calendar is a document in which information on all working and non-working days (weekends and public holidays) of a calendar year is presented in tabular form. It also shows the pre-holiday days, with a reduced working day by one hour and the norms of working hours monthly, quarterly, for half a year and for the whole year with a 40-, 36- and 24-hour working week.
The production calendar is widely used by employees of the accounting service, the personnel department when maintaining a time sheet, scheduling work, calculating wages, etc.
Production calendar of Russia for 2015
The labor calendar tells how we work and rest throughout the year.
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
29 | 30 | 31 | 1 | 2 | 3 | 4 |
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 | 31 | 1 |
2 | 3 | 4 | 5 | 6 | 7 | 8 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
26 | 27 | 28 | 29 | 30 | 31 | 1 |
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 1 |
2 | 3 | 4 | 5 | 6 | 7 | 8 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
23 | 24 | 25 | 26 | 27 | 28 | 1 |
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 | 31 | 1 | 2 | 3 | 4 | 5 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
30 | 31 | 1 | 2 | 3 | 4 | 5 |
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 | 1 | 2 | 3 |
4 | 5 | 6 | 7 | 8 | 9 | 10 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
27 | 28 | 29 | 30 | 1 | 2 | 3 |
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 | 31 |
1 | 2 | 3 | 4 | 5 | 6 | 7 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
1 | 2 | 3 | 4 | 5 | 6 | 7 |
8 | 9 | 10 | 11 | 12 | 13 | 14 |
15 | 16 | 17 | 18 | 19 | 20 | 21 |
22 | 23 | 24 | 25 | 26 | 27 | 28 |
29 | 30 | 1 | 2 | 3 | 4 | 5 |
6 | 7 | 8 | 9 | 10 | 11 | 12 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
29 | 30 | 1 | 2 | 3 | 4 | 5 |
6 | 7 | 8 | 9 | 10 | 11 | 12 |
13 | 14 | 15 | 16 | 17 | 18 | 19 |
20 | 21 | 22 | 23 | 24 | 25 | 26 |
27 | 28 | 29 | 30 | 31 | 1 | 2 |
3 | 4 | 5 | 6 | 7 | 8 | 9 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
27 | 28 | 29 | 30 | 31 | 1 | 2 |
3 | 4 | 5 | 6 | 7 | 8 | 9 |
10 | 11 | 12 | 13 | 14 | 15 | 16 |
17 | 18 | 19 | 20 | 21 | 22 | 23 |
24 | 25 | 26 | 27 | 28 | 29 | 30 |
31 | 1 | 2 | 3 | 4 | 5 | 6 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
31 | 1 | 2 | 3 | 4 | 5 | 6 |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 1 | 2 | 3 | 4 |
5 | 6 | 7 | 8 | 9 | 10 | 11 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
28 | 29 | 30 | 1 | 2 | 3 | 4 |
5 | 6 | 7 | 8 | 9 | 10 | 11 |
12 | 13 | 14 | 15 | 16 | 17 | 18 |
19 | 20 | 21 | 22 | 23 | 24 | 25 |
26 | 27 | 28 | 29 | 30 | 31 | 1 |
2 | 3 | 4 | 5 | 6 | 7 | 8 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
26 | 27 | 28 | 29 | 30 | 31 | 1 |
2 | 3 | 4 | 5 | 6 | 7 | 8 |
9 | 10 | 11 | 12 | 13 | 14 | 15 |
16 | 17 | 18 | 19 | 20 | 21 | 22 |
23 | 24 | 25 | 26 | 27 | 28 | 29 |
30 | 1 | 2 | 3 | 4 | 5 | 6 |
Mon | W | Wed | NS | Fri | Sat | Sun |
---|---|---|---|---|---|---|
30 | 1 | 2 | 3 | 4 | 5 | 6 |
7 | 8 | 9 | 10 | 11 | 12 | 13 |
14 | 15 | 16 | 17 | 18 | 19 | 20 |
21 | 22 | 23 | 24 | 25 | 26 | 27 |
28 | 29 | 30 | 31 | 1 | 2 | 3 |
4 | 5 | 6 | 7 | 8 | 9 | 10 |
Note:
Weekends and public holidays are marked in red
Pre-holiday days are marked in orange (with a reduced working day by one hour)
Working hours
January | February | March | 1st quarter | April | May | June | 2nd quarter | 1st half of the year | |
Number of days | |||||||||
Calendar days | 31 | 28 | 31 | 90 | 30 | 31 | 30 | 91 | 181 |
Working days | 15 | 19 | 21 | 55 | 22 | 18 | 21 | 61 | 116 |
Weekends and holidays | 16 | 9 | 10 | 35 | 8 | 13 | 9 | 30 | 65 |
40-hour work week | 120 | 152 | 168 | 440 | 175 | 143 | 167 | 485 | 925 |
36 hour work week | 108 | 136,8 | 151,2 | 396 | 157,4 | 128,6 | 150,2 | 436,2 | 832,2 |
24-hour work week | 72 | 91,2 | 100,8 | 264 | 104,6 | 85,4 | 99,8 | 289,8 | 553,8 |
July | August | September | 3rd quarter | October | November | December | 4th quarter | 2nd half of the year | Year | |
Number of days | ||||||||||
Calendar days | 31 | 31 | 30 | 92 | 31 | 30 | 31 | 92 | 184 | 365 |
Working days | 23 | 21 | 22 | 66 | 22 | 20 | 23 | 65 | 131 | 247 |
Weekends and holidays | 8 | 10 | 8 | 26 | 9 | 10 | 8 | 27 | 53 | 118 |
Working time (number of hours) | ||||||||||
40-hour work week | 184 | 168 | 176 | 528 | 176 | 159 | 183 | 518 | 1046 | 1971 |
36 hour work week | 165,6 | 151,2 | 158,4 | 475,2 | 158,4 | 143 | 164,6 | 466 | 941,2 | 1773,4 |
24-hour work week | 110,4 | 100,8 | 105,6 | 316,8 | 105,6 | 95 | 109,4 | 310 | 626,8 | 1180,6 |
According to the production calendar of the Russian Federation for 2015, there are 247 workers in the country (including 5 that precede holidays) and 118 weekends and holidays.
Working hours in 2015 are:
- with a 40-hour working week: 1971 hours (247 * 8 - 5, where 247 is the number of working days in a year, 8 is the length of the working day, 5 is the number of working hours reduced due to pre-holiday days);
- with a 36-hour work week: 1773.4 hours (247 * 7.2 - 5);
- with a 24-hour work week: 1180.6 hours (247 * 4.8 - 5).
Non-working holidays in 2015 in Russia
Non-working days in Russia in 2015 will be:
- January 1-6 and 8 - New Year's holidays;
- January 7 - Nativity of Christ;
- February 23 - Defender of the Fatherland Day;
- March 8 - International Women's Day;
- May 1 - Spring and Labor Day;
- May 9 - Victory Day;
- June 12 - Day of Russia;
- November 4 - National Unity Day.
List of pre-holiday days:
- April 30
- May 8
- June 11
- the 3rd of November
- 31th of December
According to Art. 112 of the Labor Code of the Russian Federation, if a public holiday falls on a day off, then the next working day after the holiday is also a day off. The government can make changes to the production calendar, making the transfer of non-working holidays and weekends to other days. So, the draft resolution of the Government of the Russian Federation "On the transfer of days off in 2015" provides for the following transfers:
- from Saturday 3 January 2015 to Friday 9 January 2015;
- from Sunday 4 January 2015 to Monday 4 May 2015
Any company knows that paying taxes on time is just as important as paying wages. Tax calendars will remind you when and what tax to pay.
Production calendar Is an important assistant in the work of an accountant! The information provided in the production calendar will help you avoid errors in the calculation of wages, facilitate the calculation of working hours, sick leave or vacation.
The calendar for 2019 will show the holidays, tell about the transfer of weekends and holidays in the current year.
On one page, designed in the form of a calendar with comments, we tried to collect all the basic information that is in demand in your work every day!
This production calendar has been prepared on the basis of Resolution PGovernment of the Russian Federation of October 1, 2018 No. 1163 " "
First quarter
JANUARY | FEBRUARY | MARCH | ||||||||||||||||
Mon | 7 | 14 | 21 | 28 | 4 | 11 | 18 | 25 | 4 | 11 | 18 | 25 | ||||||
W | 1 | 8 | 15 | 22 | 29 | 5 | 12 | 19 | 26 | 5 | 12 | 19 | 26 | |||||
Wed | 2 | 9 | 16 | 23 | 30 | 6 | 13 | 20 | 27 | 6 | 13 | 20 | 27 | |||||
NS | 3 | 10 | 17 | 24 | 31 | 7 | 14 | 21 | 28 | 7* | 14 | 21 | 28 | |||||
Fri | 4 | 11 | 18 | 25 | 1 | 8 | 15 | 22* | 1 | 8 | 15 | 22 | 29 | |||||
Sat | 5 | 12 | 19 | 26 | 2 | 9 | 16 | 23 | 2 | 9 | 16 | 23 | 30 | |||||
Sun | 6 | 13 | 20 | 27 | 3 | 10 | 17 | 24 | 3 | 10 | 17 | 24 | 31 |
January | February | March | I quarter. | |
Number of days | ||||
Calendar | 31 | 28 | 31 | 90 |
Workers | 17 | 20 | 20 | 57 |
Weekends, holidays | 14 | 8 | 11 | 33 |
Working hours (in hours) | ||||
40 hours. a week | 136 | 159 | 159 | 454 |
36 hours. a week | 122,4 | 143 | 143 | 408,4 |
24 hours. a week | 81,6 | 95 | 95 | 271,6 |
Second quarter
APRIL | MAY | JUNE | ||||||||||||||||
Mon | 1 | 8 | 15 | 22 | 29 | 6 | 13 | 20 | 27 | 3 | 10 | 17 | 24 | |||||
W | 2 | 9 | 16 | 23 | 30* | 7 | 14 | 21 | 28 | 4 | 11* | 18 | 25 | |||||
Wed | 3 | 10 | 17 | 24 | 1 | 8* | 15 | 22 | 29 | 5 | 12 | 19 | 26 | |||||
NS | 4 | 11 | 18 | 25 | 2 | 9 | 16 | 23 | 30 | 6 | 13 | 20 | 27 | |||||
Fri | 5 | 12 | 19 | 26 | 3 | 10 | 17 | 24 | 31 | 7 | 14 | 21 | 28 | |||||
Sat | 6 | 13 | 20 | 27 | 4 | 11 | 18 | 25 | 1 | 8 | 15 | 22 | 29 | |||||
Sun | 7 | 14 | 21 | 28 | 5 | 12 | 19 | 26 | 2 | 9 | 16 | 23 | 30 |
April | May | June | II quarter. | 1st p / g | |
Number of days | |||||
Calendar | 30 | 31 | 30 | 91 | 181 |
Workers | 22 | 18 | 19 | 59 | 116 |
Weekends, holidays | 8 | 13 | 11 | 32 | 65 |
Working hours (in hours) | |||||
40 hours. a week | 175 | 143 | 151 | 469 | 923 |
36 hours. a week | 157,4 | 128,6 | 135,8 | 421,8 | 830,2 |
24 hours. a week | 104,6 | 85,4 | 90,2 | 280,2 | 551,8 |
Third quarter
JULY | AUGUST | SEPTEMBER | ||||||||||||||||
Mon | 1 | 8 | 15 | 22 | 29 | 5 | 12 | 19 | 26 | 2 | 9 | 16 | 23/30 | |||||
W | 2 | 9 | 16 | 23 | 30 | 6 | 13 | 20 | 27 | 3 | 10 | 17 | 24 | |||||
Wed | 3 | 10 | 17 | 24 | 31 | 7 | 14 | 21 | 28 | 4 | 11 | 18 | 25 | |||||
NS | 4 | 11 | 18 | 25 | 1 | 8 | 15 | 22 | 29 | 5 | 12 | 19 | 26 | |||||
Fri | 5 | 12 | 19 | 26 | 2 | 9 | 16 | 23 | 30 | 6 | 13 | 20 | 27 | |||||
Sat | 6 | 13 | 20 | 27 | 3 | 10 | 17 | 24 | 31 | 7 | 14 | 21 | 28 | |||||
Sun | 7 | 14 | 21 | 28 | 4 | 11 | 18 | 25 | 1 | 8 | 15 | 22 | 29 |
July | August | September | III quarter. | |
Number of days | ||||
Calendar | 31 | 31 | 30 | 92 |
Workers | 23 | 22 | 21 | 66 |
Weekends, holidays | 8 | 9 | 9 | 26 |
Working hours (in hours) | ||||
40 hours. a week | 184 | 176 | 168 | 528 |
36 hours. a week | 165,6 | 158,4 | 151,2 | 475,2 |
24 hours. a week | 110,4 | 105,6 | 100,8 | 316,8 |
Fourth quarter
OCTOBER | NOVEMBER | DECEMBER | ||||||||||||||||
Mon | 7 | 14 | 21 | 28 | 4 | 11 | 18 | 25 | 2 | 9 | 16 | 23/30 | ||||||
W | 1 | 8 | 15 | 22 | 29 | 5 | 12 | 19 | 26 | 3 | 10 | 17 | 24/31* | |||||
Wed | 2 | 9 | 16 | 23 | 30 | 6 | 13 | 20 | 27 | 4 | 11 | 18 | 25 | |||||
NS | 3 | 10 | 17 | 24 | 31 | 7 | 14 | 21 | 28 | 5 | 12 | 19 | 26 | |||||
Fri | 4 | 11 | 18 | 25 | 1 | 8 | 15 | 22 | 29 | 6 | 13 | 20 | 27 | |||||
Sat | 5 | 12 | 19 | 26 | 2 | 9 | 16 | 23 | 30 | 7 | 14 | 21 | 28 | |||||
Sun | 6 | 13 | 20 | 27 | 3 | 10 | 17 | 24 | 1 | 8 | 15 | 22 | 29 |
October | November | December | IV quarter. | 2nd p / g | 2019 G. | |
Number of days | ||||||
Calendar | 31 | 30 | 31 | 92 | 184 | 365 |
Workers | 23 | 20 | 22 | 65 | 131 | 247 |
Weekends, holidays | 8 | 10 | 9 | 27 | 53 | 118 |
Working hours (in hours) | ||||||
40 hours. a week | 184 | 160 | 175 | 519 | 1047 | 1970 |
36 hours. a week | 165,6 | 144 | 157,4 | 467 | 942,2 | 1772,4 |
24 hours. a week | 110,4 | 96 | 104,6 | 311 | 627,8 | 1179,6 |
* Pre-holiday days, during which the working time is reduced by one hour.
Production calendar 2015 designed to track working hours. All working hours and working hours for each month, quarter and half of 2015. Detailed commentary on the production calendar.
The production calendar for 2015 was drawn up in accordance with the "On the transfer of weekends in 2015".
The 2015 calendar contains the norm of working days and working hours for months, quarters, semesters and 2015 as a whole with a 40-, 36- and 24-hour work week, as well as the number of working days and days off for a five-day work week with two days off ...
Production calendar
with a five-day work week
I quarter 2015
JANUARY | FEBRUARY | MARCH | |||||||||||||||
Mon | 5 | 12 | 19 | 26 | 2 | 9 | 16 | 23 | 2 | 9 | 16 | 23 | 30 | ||||
tue | 6 | 13 | 20 | 27 | 3 | 10 | 17 | 24 | 3 | 10 | 17 | 24 | 31 | ||||
Wed | 7 | 14 | 21 | 28 | 4 | 11 | 18 | 25 | 4 | 11 | 18 | 25 | |||||
NS | 1 | 8 | 15 | 22 | 29 | 5 | 12 | 19 | 26 | 5 | 12 | 19 | 26 | ||||
Fri | 2 | 9 | 16 | 23 | 30 | 6 | 13 | 20 | 27 | 6 | 13 | 20 | 27 | ||||
Sat | 3 | 10 | 17 | 24 | 31 | 7 | 14 | 21 | 28 | 7 | 14 | 21 | 28 | ||||
sun | 4 | 11 | 18 | 25 | 1 | 8 | 15 | 22 | 1 | 8 | 15 | 22 | 29 |
*
I quarter 2015
Indicator / month |
January |
February |
March |
I quarter 2015 |
Calendar days |
||||
Working days |
||||
Weekends and holidays |
||||
II quarter 2015
APRIL | MAY | JUNE | ||||||||||||||
Mon | 6 | 13 | 20 | 27 | 4 | 11 | 18 | 25 | 1 | 8 | 15 | 22 | 29 | |||
tue | 7 | 14 | 21 | 28 | 5 | 12 | 19 | 26 | 2 | 9 | 16 | 23 | 30 | |||
Wed | 1 | 8 | 15 | 22 | 29 | 6 | 13 | 20 | 27 | 3 | 10 | 17 | 24 | |||
NS | 2 | 9 | 16 | 23 | 30* | 7 | 14 | 21 | 28 | 4 | 11* | 18 | 25 | |||
Fri | 3 | 10 | 17 | 24 | 1 | 8* | 15 | 22 | 29 | 5 | 12 | 19 | 26 | |||
Sat | 4 | 11 | 18 | 25 | 2 | 9 | 16 | 23 | 30 | 6 | 13 | 20 | 27 | |||
sun | 5 | 12 | 19 | 26 | 3 | 10 | 17 | 24 | 31 | 7 | 14 | 21 | 28 |
* Pre-holiday days in which the working time is reduced by one hour.
Working time (working hours) forII quarter 2015 andI half of 2015
Number of days (per 5-day working week) |
|||||
Indicator / month |
April |
June |
II quarter 2015 |
First half of 2015 |
|
Calendar days |
|||||
Working days |
|||||
Weekends and holidays |
|||||
Working hours (number of working hours) |
|||||
With a 40 hour work week |
|||||
With a 36 hour work week |
|||||
With a 24 hour work week |
III quarter 2015
JULY | AUGUST | SEPTEMBER | ||||||||||||||
Mon | 6 | 13 | 20 | 27 | 3 | 10 | 17 | 24 | 31 | 7 | 14 | 21 | 28 | |||
tue | 7 | 14 | 21 | 28 | 4 | 11 | 18 | 25 | 1 | 8 | 15 | 22 | 29 | |||
Wed | 1 | 8 | 15 | 22 | 29 | 5 | 12 | 19 | 26 | 2 | 9 | 16 | 23 | 30 | ||
NS | 2 | 9 | 16 | 23 | 30 | 6 | 13 | 20 | 27 | 3 | 10 | 17 | 24 | |||
Fri | 3 | 10 | 17 | 24 | 31 | 7 | 14 | 21 | 28 | 4 | 11 | 18 | 25 | |||
Sat | 4 | 11 | 18 | 25 | 1 | 8 | 15 | 22 | 29 | 5 | 12 | 19 | 26 | |||
sun | 5 | 12 | 19 | 26 | 2 | 9 | 16 | 23 | 30 | 6 | 13 | 20 | 27 |
Working time (working hours) forIII quarter 2015 and 9 months 2015
Number of days (per 5-day working week) |
|||||
Indicator / month |
July |
August |
September |
III quarter 2015 |
9 months 2015 |
Calendar days |
|||||
Working days |
|||||
Weekends and holidays |
|||||
Working hours (number of working hours) |
|||||
With a 40 hour work week |
|||||
With a 36 hour work week |
|||||
With a 24 hour work week |
IV quarter 2015
OCTOBER | NOVEMBER | DECEMBER | ||||||||||||||
Mon | 5 | 12 | 19 | 26 | 2 | 9 | 16 | 23 | 30 | 7 | 14 | 21 | 28 | |||
tue | 6 | 13 | 20 | 27 | 3* | 10 | 17 | 24 | 1 | 8 | 15 | 22 | 29 | |||
Wed | 7 | 14 | 21 | 28 | 4 | 11 | 18 | 25 | 2 | 9 | 16 | 23 | 30 | |||
NS | 1 | 8 | 15 | 22 | 29 | 5 | 12 | 19 | 26 | 3 | 10 | 17 | 24 | 31* | ||
Fri | 2 | 9 | 16 | 23 | 30 | 6 | 13 | 20 | 27 | 4 | 11 | 18 | 25 | |||
Sat | 3 | 10 | 17 | 24 | 31 | 7 | 14 | 21 | 28 | 5 | 12 | 19 | 26 | |||
sun | 4 | 11 | 18 | 25 | 1 | 8 | 15 | 22 | 29 | 6 | 13 | 20 | 27 |
* Pre-holiday days in which the working time is reduced by one hour.
Working time (working hours) forIV quarter 2015,II half of the year and 2015
Number of days (per 5-day working week) |
||||||
Indicator / month |
October |
November |
December |
IV quarter 2015 |
II half of 2015 |
2015 year |
Calendar days |
||||||
Working days |
||||||
Weekends and holidays |
||||||
Working hours (number of working hours) |
||||||
With a 40 hour work week |
||||||
With a 36 hour work week |
||||||
With a 24 hour work week |